Our Portfolio

The London Olympic Stadium

Client : Seele Providing the centrepiece for London’s 2012 Olympic Games, this soon to be iconic stadium will play host to spectacular sporting events performed before an 80,000 strong crowd.

Olympic Bridge

Client : Waagner Biro The Central Park footbridge spans over the River Lea at the focal point of London’s Olympic Park, directly between the main stadium and the iconic aquatics centre.  After

Wembley Stadium

Client : Multiplex M.E.L (Health and Safety) Consultants Ltd. were given the prestigious duty to oversee the construction of England’s National football stadium, from inception to eventual comple

The Crystal

Client : Waagner Biro The Siemens Urban Sustainability Centre in the heart of London’s Docklands will be an iconic building providing a place for community enjoyment as well as promoting educati

Concourse Roof London Bridge

Client: Seele The station roof adjoining the Shard was replaced by a new glass roof above the main station concourse including the bus station and gateline which were completely reconfigured as ena

The Tate Modern

Client: Seele M.E.L. (Health and Safety) Consultants Limited assisted Seele in planning, managing and monitoring all aspects of health and safety and, in particular, lifting operations for this pro

King’s Cross Station

Client : Seele Following major redevelopment and expansion the new western concourse alongside Kings Cross Station has been covered by a freestanding shell roof structure spanning almost 9000m².

St George Wharf Tower

Client : Brookfield Multiplex Brookfield Multiplex continues to shape London’s skyline with The Tower at St George Wharf which is one of the tallest residential building in Europe. Located in Vau